What is a mitigated Fonsi?
The FONSI may be a mitigated FONSI in which case the required mitigation factors should be listed in the FONSI. The use of a mitigated FONSI is conditioned upon the implementation of the identified mitigation measures in the EA that support the FONSI.
What is an Fonsi?
A FONSI is a document that presents the reasons why the agency has concluded that there are no significant environmental impacts projected to occur upon implementation of the action.
What is a finding of no significant impact?
Finding of no significant impact means a document by a Federal agency briefly presenting the reasons why an action, not otherwise excluded (§ 1508.4), will not have a significant effect on the human environment and for which an environmental impact statement therefore will not be prepared.
Does NEPA require mitigation measures be implemented?
While NEPA requires consideration of mitigation, it does not mandate the form or adoption of any mitigation. Mitigation includes: (1) Avoiding the impact altogether by not taking a certain action or parts of an action. (2) Minimizing impacts by limiting the degree or magnitude of the action and its implementation.
Can mitigation be used to justify a Fonsi?
* This use of mitigation may allow the agency to comply with NEPA’s procedural requirements by issuing an EA and a Finding of No Significant Impact (FONSI), or “mitigated FONSI,” based on the agency’s commitment to ensure the mitigation that supports the FONSI is performed, thereby avoiding the need to prepare an EIS.
How do you get Fonsi?
A FONSI is issued when environmental analysis and interagency review during the EA process find a project to have no significant impacts on the quality of the environment.
What is an environmental mitigation plan?
Environmental Mitigation Plan means the plan of actions to be undertaken by the Borrower to mitigate potential negative environmental consequences of the Project, adopted by the Ministry of Environmental Protection and Physical Planning on February 2, 2003, as the same may be amended from time to time; Sample 2.
How long is a Fonsi valid?
The one-year time limit is measured from the date of the agency decision to prepare an EA to the publication of an EA or FONSI.
What are the three types of mitigation plans?
The types of mitigation enumerated by CEQ are compatible with the requirements of the Guidelines; however, as a practical matter, they can be combined to form three general types of mitigation: avoidance, minimization, and compensatory mitigation.
What is the purpose of mitigation?
The purpose of mitigation planning is to identify policies and actions that can be implemented over the long term to reduce risk and future losses.
What does an environmental impact statement do?
An EIS assesses the potential impact of actions “significantly affecting the quality of the human environment.” The environmental impact statement (EIS) is a government document that outlines the impact of a proposed project on its surrounding environment.
What is the intransitive use of mitigate?
Some 56 percent also rejected the intransitive use of mitigate meaning “to take action to alleviate something undesirable,” in What steps can the town take to mitigate against damage from coastal storms? Perhaps the use with against in the one instance has soured Panelists on its use in the other.
What does it mean to mitigate a crime?
: to lessen or minimize the severity of what actions the State took to mitigate the hazardous conditions — Estate of Arrowwood v. State, 894 P.2d 642 (1995) factors that mitigate the crime — see also mitigation of damages sense 1 — compare aggravate
What is the difference between mitigate and militate?
Those two words are not closely related etymologically ( mitigate descends from the Latin verb mitigare, meaning “to soften,” whereas militate traces to militare, another Latin verb that means “to engage in warfare”), nor are they particularly close in meaning ( militate means “to have weight or effect”).
What was the final EA and FONSI for Piqua?
Final EA and FONSI for Proposed Demolition of the Buildings at the Piqua, Ohio, Decommissioned Reactor Site in Ohio. Finding of No Significant Impact and Mitigation Action Plan (DOE/EA-2050) for the Marys Peak BPA Communications Site.